 | EUDCA-09/2025-26(Open Dt.30/5/2025) |
| BAMBOO LADDER |
| Read more... |
 | EUDCA-08/2025-26(Open Dt.30/5/2025) |
| fo|qr uxjh; forj.k e.My] vyhx< ds vUrxZr iz;ksxkFkZ fofHkUu izdkj dh lkefxz;ksa dh vkiwfrZA |
| Read more... |
 | EUDCA-07/2025-26(Open Dt.30/5/2025) |
| REPLACEMENT OF DAMAGED DISTRIBUTION TRANSFORMERS WITHIN THE AREA OF EUDC, ALIGARH |
| Read more... |
 | EUDCA-33/2025-26(Open Dt.22/5/2025) |
| Hiring of Commercial Vehicle for maintenane purpose in the area of EUDC, Aligarh |
| Read more... |
 | EUDCA-05/2025-26(Open Dt.22/5/2025) |
| fo|qr uxjh; forj.k e.My] vyhx< ds {ks=kUrxZr xys gq, ,l0Vh0 iksykssa dh cSfYMax dj mudh fIyaFk fuekZ.k dk dk;Z fof’k”Vhd... |
| Read more... |
 | EUDCA-01/2025-26(Open Dt.22/5/2025) |
| various electrical work for issuing new connection to Electric Bus Charging Point at Masoodabad Bus Stand against packag... |
| Read more... |
 | 13/EDC/L/2024-25(Open Dt.23/5/2025) |
| Construction of 11 KV/LT line and substation in the area of EDD- Mehroni under the deposit scheme |
| Read more... |
 | EDCK-04/2025-26(Open Dt.23/5/2025) |
| EDCK-04/2025-26 |
| Read more... |
 | edck-03/2025-26(Open Dt.23/5/2025) |
| edck-03/2025-26 |
| Read more... |
 | 17/EDC-II(M)/2025-26(Open Dt.27/5/2025) |
| Work of Repairing & Maintenance of HT/LT lines in Deviy Aapda and other work in the area of EDSD-Naujheel under EDD-Mant... |
| Read more... |
 | 16/EDC-II(M)/2025-26(Open Dt.27/5/2025) |
| Work of Repairing & Maintenance of HT/LT lines in Deviy Aapda and other work in the area of EDSD-Mant under EDD-Mant, Ma... |
| Read more... |
 | 15/EDC-II(M)/2025-26(Open Dt.27/5/2025) |
| Work of Repairing & Maintenance of HT/LT lines in Deviy Aapda and other work in the area of EDSD-Raya under EDD-Laxminag... |
| Read more... |
 | 14/EDC-II(M)/2025-26(Open Dt.27/5/2025) |
| Work of Repairing & Maintenance of HT/LT lines in Deviy Aapda and other work in the area of EDSD-Laxminagar under EDD-La... |
| Read more... |
 | 13/EDC-II(M)/2025-26(Open Dt.27/5/2025) |
| Deposit work in the area of EDSD-Laxminagar under EDD-Laxminagar, Mathura |
| Read more... |
 | 12/ECC(D)Ag/2025-26(Open Dt.29/5/2025) |
| gkbZfMy dkWyksuh] yky fMXxh vyhx<+ esa foHkkxh; vkoklh; Hkouksa ,oa vukoklh; Hkouksa@dk;kZy;ksa ds okf”kZd vuqj{k.k dk;Z... |
| Read more... |
 | 06/ECC(D)Ag/2025-26(Open Dt.29/5/2025) |
| izcU/k funs’kd] n0fo0fo0fu0fy0 vkxjk dk;kZy; ifjlj] izcU/k funs’kd ,oa funs’kdx.k] vf/kdkjh@ deZpkjh fo|qr dkWyksuh ds v... |
| Read more... |
 | 05/ECC(D)Ag/2025-26(Open Dt.29/5/2025) |
| izcU/k funs’kd dk;kZy; Hkou ,oa fo|qr dkWyksuh ds vf/kdkjh@deZpkjh vkoklksa ds okf”kZd vuqj{k.k dk;ZA |
| Read more... |
 | 55/EDCK/2024-25(Open Dt.31/5/2025) |
| AS PER TENDER DOCUMENT |
| Read more... |
 | 05/EDC(KNJ)/2025-26(Open Dt.22/5/2025) |
| fo|qr forj.k [k.M dUUkkSt ds vUrxZr mi[k.M r`rh; dUukSt ds vkj0,0ih0Mh0vkj0ih0 Vkmu dUukSt esa 10 ds0oh0,0 ls 630 ds0oh0... |
| Read more... |
 | 04/EDC(KNJ)/2025-26(Open Dt.22/5/2025) |
| fo|qr forj.k [k.M fNcjkeÅ ds vUrxZr vuqj{k.k en esa {kfrxzLr 33 ds0oh0@11ds0oh0 ,oa ,y0Vh0 fo|qr ykbuksa ds vuqj{k.k dk ... |
| Read more... |
 | 03/EDC(KNJ)/2025-26(Open Dt.22/5/2025) |
| fo|qr forj.k [k.M dUukSt ds vUrxZr vuqj{k.k en esa {kfrxzLr 33 ds0oh0@11ds0oh0 ,oa ,y0Vh0 fo|qr ykbuksa ds vuqj{k.k dk d... |
| Read more... |
 | 01/2025-26/EDC ETAH(Open Dt.22/5/2025) |
| Erection of electricity lines under Deposit head in the area of EDD, Jalesar, Etah under EDC, Etah. |
| Read more... |
 | 03/EDC(O)/W/2025-26(Open Dt.2/6/2025) |
| fo|qr forj.k [k.M&çFke] mjbZ ds vUrxZr fo|qr forj.k mi[k.M&dksap ,oa mjbZ xzkeh.k esa Hkfo’; esa tek ;kstuk esa djk;s tk... |
| Read more... |
 | T-04/ECC(D)/K/2025-26(Open Dt.3/6/2025) |
| fo|qr dkyksuh xksfoUn uxj dkuiqj esa fLFkr uydwi lapkyu ,oa tykiwfrZ lEcU/kh j[kj[kko dk dk;ZA |
| Read more... |
 | T-03 (2025-26)(Open Dt.30/5/2025) |
| Full deposite Work under EDD Jasrana |
| Read more... |
 | T-02 (2025-26)(Open Dt.30/5/2025) |
| Full Deposite Work under EDD Firozabad |
| Read more... |
 | EUDC/F/T-10/2025-26(Open Dt.30/5/2025) |
| EUDC/F/T-10/2025-26 |
| Read more... |
 | 11/ECC(D)Ag/2025-26(Open Dt.29/5/2025) |
| VªkftV gkWLVy] n0fo0fo0fu0fy0] vkxjk dh fnu& izfrfnu dh lkQ&lQkbZ ,oa gkmldhfiax ds dk;ZA |
| Read more... |
 | 10/ECC(D)Ag/2025-26(Open Dt.29/5/2025) |
| uofufeZr vkbZ0Vh0 izf’k{k.k dsUnz vkxjk ij d{kksa ds j[kj[kko ¼gkmldhfiax½ fdfpu@eSl lapkyu] fo|qr j[kj[kko ,oa vU; lEcf... |
| Read more... |
 | 09/ECC(D)Ag/2025-26(Open Dt.29/5/2025) |
| fo|qr vf/kdkjh dkWyksuh] vkxjk ds fo|qr okf”kZd vuqj{k.k dk;Z gsrq nks vn~n bysDVªhf’k;u ckg~; ,tsUlh ds ek/;e ls j[kus ... |
| Read more... |
 | 08/ECC(D)Ag/2025-26(Open Dt.29/5/2025) |
| VkbZi iape vf/kdkjh vkoklh; dkWyksuh esa ckg~; ,tsUlh dk;kZy; ifjlj esa ckg~; ,tsUlh ds ek/;e ls okf”kZd ykWu@ikdZ eSUVs... |
| Read more... |
 | 07/ECC(D)Ag/2025-26(Open Dt.29/5/2025) |
| izcU/k funs’kd] vkxjk dk;kZy; ifjlj esa ckg~; ,tsUlh ds ek/;e ls okf”kZd ykWu@ikdZ eSUVsusUl ,oa IykUVs’ku ds dk;ZA |
| Read more... |
 | 21/EDC(F)/2025-26(Open Dt.25/5/2025) |
| Sarak Churikaran Hetu Line Shifting (Kampil to Kaimganj) under EDD Kaimganj |
| Read more... |
 | 20/EDC(F)/2025-26(Open Dt.25/5/2025) |
| Sarak Churikaran Hetu Line Shifting (Fatehgarh to Gursahganj Part-2) under EDD Farrukhabad |
| Read more... |
 | 19/EDC(F)/2025-26(Open Dt.25/5/2025) |
| Sarak Churikaran Hetu Line Shifting (Fatehgrah to Gursahaganj (Part-1)under EDD Farrukhabad |
| Read more... |
 | 18/EDC(F)/2025-26(Open Dt.25/5/2025) |
| Sarak Churikaran Hetu Line Shifting (Mohamdabad to Jahanganj) under EDD Farrukhabad |
| Read more... |
 | 17/EDC(F)/2025-26(Open Dt.25/5/2025) |
| Sarak Churikaran Hetu Line Shifting (Khudaganj to Shingirampur) under EDD Farrukhabad |
| Read more... |
 | 16/EDC(F)/2025-26(Open Dt.25/5/2025) |
| Sarak Chaurikaran hetu Line Shifting (Mela Ram Nagriya Ghat) under EDD Farrukhabad |
| Read more... |
 | 08/EDC(O)/W/2025-26(Open Dt.30/5/2025) |
| fo|qr forj.k [k.M&f}rh;] mjbZ ds dk;Z{ks= esa o’kZ 2025&26 esa vks0,.M+,e0 en esa VsM+s iksyksa dks lh/kk djuk] VwVs iks... |
| Read more... |
 | 07/EDC(O)/W/2025-26(Open Dt.30/5/2025) |
| fo|qr forj.k [k.M&çFke] mjbZ ds dk;Z{ks= esa o’kZ 2025&26 esa vks0,.M+,e0 en esa VsM+s iksyksa dks lh/kk djuk] VwVs iksy... |
| Read more... |
 | T-03/ECC(D)/K/2025-26(Open Dt.3/6/2025) |
| fo|qr dkyksuh xksfoUn uxj dkuiqj fLFkr vkoklh;@vukoklh; ifjlj ds jksM] ukyh dh lQkbZ]dwqMk dpjk mBkus ]fuLrkj.k dk;Z ,o... |
| Read more... |
 | T-02/ECC(D)/K/2025-26(Open Dt.3/6/2025) |
| fo|qr dkyksuh xksfoUn uxj dkuiqj fLFkr vukoklh; esa okf”kZd vuqj{k.k ,oa ejEer ,oa vU; tkuinh; dk;Z A |
| Read more... |
 | T-01/ECC(D)/K/2025-26(Open Dt.3/6/2025) |
| fo|qr dkyksuh xksfoUn uxj dkuiqj fLFkr vkoklh; Hkouksa ]lMd] ukyh bR;kfn ds okf”kZd vuqj{k.k ,oa ejEer lEcU/kh dk;ZA |
| Read more... |
 | 03/EDC/L/2025-26(Open Dt.23/5/2025) |
| Repairing of damaged lines due to heavy Storm(Deviya Apada), Under EDD-Mehroni, Lalitpur |
| Read more... |
 | 02/EDC/L/2025-26(Open Dt.23/5/2025) |
| Repairing of damaged lines due to heavy Storm(Deviya Apada), Under EDD, Lalitpur |
| Read more... |
 | 08/EDC-II(M)/2025-26(Open Dt.24/5/2025) |
| Installation of 11 KV CT/PT pole mounted units under EDD-Mant, Mathura |
| Read more... |
 | 07/EDC-II(M)/2025-26(Open Dt.24/5/2025) |
| Installation of 11 KV CT/PT pole mounted units under EDD-Laxminagar, Mathura |
| Read more... |
 | 05/EDC-II(M)/2025-26(Open Dt.26/5/2025) |
| Deposit work in the area of EDSD-Laxminagar under EDD-Laxminagar, Mathura |
| Read more... |
 | 06/EDC(O)/P/2025-26(Open Dt.26/5/2025) |
| Supply of Various Type 33 Kv & 11 Kv Jointing Kits at ESC Orai |
| Read more... |
 | 13/EDCKD/2025-26(Open Dt.29/5/2025) |
| जनपद कानपुर देहात के अन्तर्गत पूर्ण जमा योजना के अधीन नबीपुर-गजनेर मार्ग चैडीकरण में बाधक पोलों को शिफ्ट(विस्थापित) करने... |
| Read more... |
 | 12/EDCKD/2025-26(Open Dt.23/5/2025) |
| विद्युत वितरण खण्ड- पुखरायां के अन्तर्गत 33 के0वी0 स्वतन्त्र पोषक अमराहट पम्प कैनाल की लाईन चोरी से क्षतिग्रस्त विद्युत ... |
| Read more... |
 | 11/EDCKD/2025-26(Open Dt.29/5/2025) |
| विद्युत वितरण खण्ड- पुखरायां के अन्तर्गत आकस्मिक अनुरक्षण एवं मरम्मत मद का कार्य। |
| Read more... |
 | 10/EDCKD/2025-26(Open Dt.29/5/2025) |
| विद्युत वितरण खण्ड- रनियां के अन्तर्गत आकस्मिक अनुरक्षण एवं मरम्मत मद का कार्य। |
| Read more... |
 | EDCH-04/2025-26(Open Dt.30/5/2025) |
| fo|qr forj.k [k.M f}rh; vks<+iqjk gkFkjl ds {ks=kUrZxr {kfrxzLr ,Dl,yih dsfcy ,oa {kfrxzLr ih0lh0lh0 ,oa ,l0Vh0ih0 iksyk... |
| Read more... |
 | 05/EUDC/JHS/2025-26(Open Dt.22/5/2025) |
| Work of Repairing and Replacement of 33 KV and 11 KV pannel and VCB wiring at 33KV SS MLPH Jhansi under EE EUDD I Jhansi |
| Read more... |
 | 04/EUDC/JHS/2025-26(Open Dt.22/5/2025) |
| Work Deposit Scheme under EE EUDD I for Sadak Suraksha in Jhansi |
| Read more... |
 | 03/ECC(D)Ag/2025-26(Open Dt.23/5/2025) |
| fo|qr Hk.Mkj dsUnz yfyriqj ftyk yfyriqj ij [kqyk 'ksM] ckm.Mªhoky] LVSfdax IysVQkeZ] nks ux 'kkSpky;] xkMZ :e dk fuekZ.k... |
| Read more... |
 | DVVNL_MM/3681-2025(Open Dt.25/5/2025) |
| 33 KV RMU |
| Read more... |
 | DVVNL/RDSS/DA-JGUA/2025/13(Open Dt.22/5/2025) |
| Work of On-grid electrification of DA-JGUA in two districts of Lalitpur and Mahoba left out Majre in DVVNL under RDSS sc... |
| Read more... |
 | 09/EDCKD/2025-26(Open Dt.23/5/2025) |
| अधिशाषी अभियन्ता, विद्युत वितरण खण्ड- झींझक के अन्तर्गत झटपट पोर्टल, निवेश मित्र पोर्टल एवं पूर्ण जमा योजना में आवेदित स... |
| Read more... |
 | 03/EUDC/JHS/2025-26(Open Dt.26/5/2025) |
| In Compliance with the instructions given in the meeting of Jhansi Distict Road safety Committee under Executive Enginee... |
| Read more... |
 | 01/EWC(K)/2025-26(Open Dt.23/5/2025) |
| विद्युत कार्य मण्डल, कानपुर के अन्तर्गत बिजनेस प्लान 2024-25 के अन्तर्गत 33/11 के0वी0 विद्युत उपकेन्द्र उमरदा का निर्माण... |
| Read more... |
 | 02/EDCK/2025-26(Open Dt.22/5/2025) |
| AS PER TENDER DOCUMENT |
| Read more... |
 | 50/EUDC/JHS/2024-25(Open Dt.26/5/2025) |
| For maintenance work in the M and R anurakshan Maah EE EUDD II Jhansi |
| Read more... |
 | 43/EUDC/JHS/2024-25(Open Dt.26/5/2025) |
| In compliance with the instructions given in the meeting of Jhansi District Road Safety Committee Under Executive Engine... |
| Read more... |
 | 02/EUDC/JHS/2025-26(Open Dt.26/5/2025) |
| In compliance with the directions given in the meeting of Jhansi District Road safety Committee under Executive Engineer... |
| Read more... |
 | EDC2A-41/2024-25(Open Dt.26/5/2025) |
| EDC2A-41/2024-25 |
| Read more... |
 | EDC2A-40/2024-25(Open Dt.26/5/2025) |
| EDC2A-40/2024-25 |
| Read more... |
 | 47/EUDC/JHS/2024-25(Open Dt.26/5/2025) |
| For the Work of M and R electrical lines on Sudden damage Breakdown of Electrical lines under the Undergraduate EE EUDD ... |
| Read more... |
 | EDCH-111/2024-25(Open Dt.26/5/2025) |
| fo|qr forj.k [k.M f}rh; gkFkjl dk;kZy; gsrq dEI;wVj ifjpkyd miyC/k djk;k tkukA |
| Read more... |
 | EDCBNDA-37/2024-25(Open Dt.23/5/2025) |
| fo-fo-[ka-] vrjkZ dh lhekUrxZr vrjkZ& fcl.Mk ekxZ ij jsyos Økflax vrjkZ leikj la[;k&476 vrjkZ&cnkSlk LVs’ku ds e/; cu jg... |
| Read more... |
 | 21/EWC(K)/2024-25(Open Dt.23/5/2025) |
| HIRING OF 01 No. CAR and 03 Nos. JEEP FOR THE OFFICES IN EWC, DVVNL, KANPUR ZONE, KANPUR |
| Read more... |
 | EDCH-115/2024-25(Open Dt.26/5/2025) |
| ,.Vh ikoj FkS¶V Fkkuk gkFkjl ,oa izoZru ny gkFkjl dk;kZy; gsrq dEI;wVj ifjpkyd miyC/k djk;k tkukA |
| Read more... |
 | EDCH-114/2024-25(Open Dt.26/5/2025) |
| fo|qr ijh{k.k [k.M gkFkjl dk;kZy; gsrq dEI;wVj ifjpkyd miyC/k djk;k tkukA |
| Read more... |
 | EDCH-113/2024-25(Open Dt.26/5/2025) |
| fo|qr forj.k [k.M prqFkZ lknkckn gkFkjl dk;kZy; gsrq dEI;wVj ifjpkyd miyC/k djk;k tkukA |
| Read more... |
 | EDCH-112/2024-25(Open Dt.26/5/2025) |
| fo|qr forj.k [k.M f}rh; gkFkjl dk;kZy; gsrq dEI;wVj ifjpkyd miyC/k djk;k tkukA |
| Read more... |
 | EDCH-110/2024-25(Open Dt.26/5/2025) |
| fo|qr uxjh; forj.k [k.M gkFkjl dk;kZy; gsrq dEI;wVj ifjpkyd miyC/k djk;k tkukA |
| Read more... |
 | EDCH-109/2024-25(Open Dt.26/5/2025) |
| fo|qr forj.k e.My gkFkjl dk;kZy; gsrq dEI;wVj ifjpkyd miyC/k djk;k tkukA |
| Read more... |
 | EDCH-119/2024-25(Open Dt.30/5/2025) |
| fo|qr forj.k [k.M r`rh; gkFkjl ,oa mi[k.M vf/kdkjh izFke@f}rh;@r`rh;@prqFkZ fldUnzkjkÅ@lkluh@gkFkjlta0@glk;u gsrq dqy 05... |
| Read more... |
 | EDCH-118/2024-25(Open Dt.30/5/2025) |
| fo|qr forj.k [k.M f}rh; gkFkjl ,oa mi[k.M vf/kdkjh izFke@f}rh; gkFkjl gsrq dqy 03 ux Mhty pfyr thi pkyd lfgr miyC/k djk;... |
| Read more... |
 | EDCH-117/2024-25(Open Dt.30/5/2025) |
| fo|qr uxjh; forj.k [k.M gkFkjl ,oa mi[k.M vf/kdkjh izFke@f}rh; gkFkjl gsrq dqy 03 ux Mhty pfyr thi pkyd lfgr miyC/k djk;... |
| Read more... |
 | 71/EDCK/2024-25(Open Dt.26/5/2025) |
| अधिशाषी अभियन्ता, उपखण्ड अधिकारी विद्युत वितरण खण्ड-चौबेपुर के प्रयोग हेतु 04 नग डीजल चलित जीप मय चालक के किराये पर उपलब... |
| Read more... |
 | 68/EDCK/2024-25(Open Dt.26/5/2025) |
| उपमुख्य लेखाधिकारी, अंचल लेखा कार्यालय, कानपुर क्षेत्र, कानपुर के प्रयोग हेतु 01 नग डीजल चलित जीप मय चालक के किराये पर उ... |
| Read more... |
 | 92/EDC-I(M)/2024-25(Open Dt.22/5/2025) |
| The Work of Construction HT/LT Line and Double Pole and Other for Release New Connection and Line Shifting Work at Vario... |
| Read more... |
 | EDC2A-38/2024-25(Open Dt.26/5/2025) |
| EDC2A-38/2024-25 |
| Read more... |
 | EDC2A-33/2024-25(Open Dt.26/5/2025) |
| EDC2A-33/2024-25 |
| Read more... |
 | EDC2A-32/2024-25(Open Dt.26/5/2025) |
| EDC2A-32/2024-25 |
| Read more... |
 | EDC2A-31/2024-25(Open Dt.26/5/2025) |
| EDC2A-31/2024-25 |
| Read more... |
 | EDC2A-30/2024-25(Open Dt.26/5/2025) |
| EDC2A-30/2024-25 |
| Read more... |
 | EDC2A-28/2024-25(Open Dt.27/5/2025) |
| EDC2A-28/2024-25 |
| Read more... |
 | EDC2A-27/2024-25(Open Dt.26/5/2025) |
| EDC2A-27/2024-25 |
| Read more... |
 | EDC2A-26/2024-25(Open Dt.26/5/2025) |
| EDC2A-26/2024-25 |
| Read more... |
 | EDC2A-25/2024-25(Open Dt.26/5/2025) |
| EDC2A-25/2024-25 |
| Read more... |
 | 36/2024-25/EDC ETAH(Open Dt.22/5/2025) |
| Providing Diesel Car (with Driver) for official use of Superintending Engineer EDC, Etah for the period wef. 01-04-2025 ... |
| Read more... |
 | 07/EWC/JHS/2024-25(Open Dt.23/5/2025) |
| बिजनेस प्लान 2024-25 के अन्तर्गत 33/11 के0वी0 सबस्टेशन सीपरी, झाँसी की क्षमतावृद्धि (2x5+1x10 MVA) से (1x5+1x8+1x10 MVA)... |
| Read more... |
 | 59/EDC/JHS/2024-25(Open Dt.23/5/2025) |
| fo|qr forj.k [k.M >kWlh ds v/khu fo|qr forj.k mi[k.M eksaB >kWLkh esa 33@11 ds0oh0 ykbZuksa esa fofHkUUk dkj.kksa ls iks... |
| Read more... |
 | 58/EDC/JHS/2024-25(Open Dt.23/5/2025) |
| fo|qr forj.k [k.M >kWlh ds v/khu fo|qr forj.k mi[k.M cchuk >kWLkh esa 33@11 ds0oh0 ykbZuksa esa fofHkUUk dkj.kksa ls iks... |
| Read more... |
 | 57/EDC/JHS/2024-25(Open Dt.23/5/2025) |
| fo|qr forj.k [k.M >kWlh ds v/khu fo|qr forj.k mi[k.M xzkeh.k >kWLkh esa 33@11 ds0oh0 ykbZuksa esa fofHkUUk dkj.kksa ls i... |
| Read more... |
 | EDC2A-17/2024-25(Open Dt.27/5/2025) |
| EDC2A-17/2024-25 |
| Read more... |
 | 13/SE/ESWC/BANDA/2024-25(Open Dt.30/5/2025) |
| Construction of New 33 KV Line from New 132 KV Sub-Station Gohand, Hamirpur to 33/11 KV Sub-Station Rehuta, Hamirpur (Le... |
| Read more... |
 | 12/SE/ESWC/BANDA/2024-25(Open Dt.30/5/2025) |
| Construction of New 33 KV Line from New 132 KV Sub-Station Gohand, Hamirpur to 33/11 KV Sub-Station Gohand, Hamirpur (Le... |
| Read more... |
 | 11/SE/ESWC/BANDA/2024-25(Open Dt.30/5/2025) |
| Construction of New 33 KV Line from New 132 KV Sub-Station Korram Baberu Banda to 33/11 KV Sub-Station Baberu Banda (Len... |
| Read more... |
 | 10/SE/ESWC/BANDA/2024-25(Open Dt.30/5/2025) |
| Construction of New 33 KV Line from New 132 KV Sub-Station Korram Baberu Banda to 33/11 KV Sub-Station Oran Banda (Lengt... |
| Read more... |
 | 09/SE/ESWC/BANDA/2024-25(Open Dt.30/5/2025) |
| Construction of New 33 KV Line from New 132 KV Sub-Station Korram Baberu Banda to 33/11 KV Sub-Station Bisanda Banda (Le... |
| Read more... |
 | 08/SE/ESWC/BANDA/2024-25(Open Dt.30/5/2025) |
| Construction of New 33 KV Line from New 132 KV Sub-Station Korram Baberu Banda to 33/11 KV Sub-Station Jaamu Banda (Leng... |
| Read more... |
 | EDCBNDA-28/2024-25(Open Dt.23/5/2025) |
| fo-fo-[ka-] vrjkZ dh lhekUrxZr uol`ftr@foLrkfjr uxj fudk; fcl.Mk ds vUrxZr fu/kkZfjr ?k.Vs fo|qr vkiwfrZ lqfuf'pr djus g... |
| Read more... |
 | 32/SE/EDCH/2024-25(Open Dt.15/1/2026) |
| 32/SE/EDCH/2024-25 |
| Read more... |
 | DVVNL-MM/3632-2024(Open Dt.31/5/2025) |
| 33 KV POST INSULATOR |
| Read more... |
 | DVVNL-MM/3610-2024(Open Dt.23/5/2025) |
| 11 KV METERING PT |
| Read more... |
 | DVVNL-MM/3609-2024(Open Dt.23/5/2025) |
| 11 KV METERING CT |
| Read more... |
 | 39/EDCKD/2024-25(Open Dt.29/5/2025) |
| विद्युत वितरण मण्डल, कानपुर देहात के अन्तर्गत विभिन्न एच0वी0 वृहद एवं भारी संयोजनों की डबल पोल यूनिट खराब होने पर नई डबल... |
| Read more... |
 | 38/EDCKD/2024-25(Open Dt.26/5/2025) |
| विद्युत वितरण खण्ड- पुखरायां के अन्तर्गत विभिन्न 33/11 के0वी0 विद्युत उपकेन्द्रों के अधीन दैवीय आपदा मद में क्षतिग्रस्त ... |
| Read more... |